Elta, Ashdod
Construction of 5-level parking building for “Elta” in Ashdod.
Without a basement level. Building with precast exterior walls. Pre-stressed concrete panels. Stone cladding.
Total area: 12,200 sq.m.
Construction of 5-level parking building for “Elta” in Ashdod.
Without a basement level. Building with precast exterior walls. Pre-stressed concrete panels. Stone cladding.
Total area: 12,200 sq.m.
Country: Israel
Country: Israel
Country: Israel
Country: Israel
Country: Israel
Country: Israel
Country: Israel
Country: Israel
Country: Israel
Country: Romania
Country: Romania
Country: Russia