Railway to Modi’in, Section 8
The project included: Bridge 14 – a 250 meter long bridge, constructed using the incremental system, 300 meter Tunnel 12 beneath Highway 1, constructed using the Cut & Cover method, 220 meter Tunnel 13.
The front structures consist of arches, covered with stone.